PMR Based on Structural Measures on Alluvial Fans PMR Based on a Levee, Berm, or Other Structural Measure PMR Based on As-Built Information Submitted as a Follow-Up to a CLOMR PMR Based on a Bridge, Culvert, Channel, Hydrology, or Combination Thereof PMR Based Solely on Submission of More Detailed Data Requests for Mapping of Physical Map Revisions (PMRs) LOMR/CLOMR Based on Structural Measures on Alluvial Fans LOMR Based Solely on Submission of More Detailed Data LOMR Based on As-Built Information Submitted as a Follow-up to a CLOMR LOMR Based on Levee, Berm or Other Structural Measures LOMR Based on Bridge, Culvert, Channel, Hydrology, or Combination Thereof Requests for Map Changes Requiring Special Technical ReviewĬLOMR Based on New Hydrology, Bridge, Culvert, Channel or Combination ThereofĬLOMR Based on Levee, Berm or Other Structural Measures Multiple-Lot/Multiple-Structure LOMR-F Based on As-Built Information (CLOMR-F previously issued by FEMA) Multiple-Lot/Multiple-Structure CLOMR-F and LOMR-F Requests for Multiple-Lot/Multiple-Structure Map Changes Single-Lot/Single-Structure LOMR-F Based on As-Built Information (CLOMR-F previously issued by FEMA) Single-Lot/Single-Structure CLOMA and CLOMR-F Requests for Single-Lot, Single-Structure Map Change By submitting requests online, fees are reduced since processing costs are lower. The current fee schedule for conditional and final map change requests submitted by MT-1 and MT-2 paper forms and the Online Letter of Map Change (LOMC) tool are provided below. Current Fee Schedule for Map Change and LODR Requests On January 21, 2015, FEMA published a Notice in the Federal Register announcing the revised fee schedule.ĭownload the Federal Register Notice: 2015 Fee Schedule for additional information. Federal Register Notices Available for Download The review and processing fees effective for 2015 include those associated with Conditional Letter of Map Amendment (CLOMA), Conditional Letter of Map Revision Based on Fill (CLOMR-F), Letter of Map Revision Based on Fill (LOMR-F), Conditional Letter of Map Revision (CLOMR), Letter of Map Revision (LOMR), Physical Map Revision (PMR), and Letter of Determination (LODR) requests. The current fee schedule will allow the Federal Emergency Management Agency (FEMA) to further reduce the expenses to the NFIP by recovering more of the costs associated with processing conditional and final map change requests. This page outlines the current fee schedule for processing certain map change requests to National Flood Insurance Program (NFIP) flood map products, Letter of Determination Review (LODR) and for Flood Insurance Study (FIS) backup data requests.Īttention: This fee schedule is effective for all requests post marked on or after February 20, 2015.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |